Euro Rigan - Adhesives for friction materials
Euro Rigan - Adhesives for friction materials
Company
Products
Engineering
Requests
News
Contacts
Adhesives for friction materials

Requests

Brake shoes
For a better analysis of you case is necessary to know the parameters about your specific bonding process. Please complete the form below and write a short description of the case

General information (* compulsory fields)

Customer's name *

Productive site *

Visit date *

Specialists * (names)

Lining's type

Flexible in segments

Flexible in roll

Moulded

The customer buys the lining

The customer self produce it

Metal part shoe

The customer buys it

The customer self produce it

The customer sand blast it

The customer control the sandblasted shoes final roughness

No
Only seeing
With instruments

The customer protect it with a paint, after sand blasting:

How many time passes (HOURS) between sandblasting
and paint coating

1
4
More

Adhesive

Trademark actually in use


Imported
Local manufactered

Monthly consuption in KG

Shelf life

3 Months
6 Months
12 Months

Packaging

25 Kg
50 Kg
200 Kg

Adhesives viscosity and solid content is verified in
customer's lab

Average price/KG paid


Possible to have a copy of the TDS and MSDS

Is applied by

Brush
Roll

Is dried

In free air
In the oven

How is verified the good final drying

Only seeing
With a weight system

Protective paint

Trademark actually in use


Imported
Local manufactered

The paint is bought ready to use

The paint is obtained from the adhesive

Monthly consuption in KG

Shelf life

3 Months
6 Months
12 Months

Packaging

25 Kg
50 Kg
200 Kg

Average price/KG paid


Possible to have a copy of the TDS and MSDS

Is applied by

Manual dip
Automatic machine

Is dried

In free air
In the oven

How is verified the good final drying

Only seeing
With a weight system

Bonding process

The clamps have the spring

The lining + metal part are assembled with clamps by

Manual plate
Automatic plate

The pressure given is

Less than 10 KG/SQCM
More than 10 KG/SQCM

The bonding process is done

In a static air oven
In a static air static oven
In a tunnel oven

The time/temperature ratio is controlled

Randomly by thermocouples inserted on the bonding line
Only by the oven temperature display
Other systems

The peak temperature is

Under 180°C
Upper 180°C

Final control after bonding

The good adhesion is verified

This verification has done

Manual
By shear test

With how kind of equipment shear test has done

Manual
Under Norms