Euro Rigan - Adhesives for friction materials
Euro Rigan - Adhesives for friction materials
Company
Products
Engineering
Requests
News
Contacts
Adhesives for friction materials

Requests

Disk pads
For a better analysis of you case is necessary to know the parameters about your specific bonding process. Please complete the form below and write a short description of the case.

General information (* compulsory fields)

Customer's name *

Productive site *

Visit date *

Specialists * (names)

Metal Support

The Customer buys it

The Customer self produce it

The Customer sand blast it

The customer control the sandblasted shoes final roughness

No
Only seeing
With instruments

How many time passes (HOURS) between sandblasting
and adhesive coating

1
4
More

Adhesive

Trademark actually in use


Imported
Local manufactered

Monthly consuption in KG

Shelf life

3 Months
6 Months
12 Months

Packaging

25 Kg
50 Kg
200 Kg

Adhesives viscosity and solid content is verified in
customer's lab

Average price/KG paid


Possible to have a copy of the TDS and MSDS

Is dried

In free air
In the oven

How is verified the good final drying

Only seeing
With a weight system

Performing process

The customer does a preformed brique

The customer puts the friction material powdder in the mould

What is the thickness ratio between the briquet and the final friction

2/1
More
Less

What is the performing pressure in KG/SQCM

150
More
Less

Moulding process

The customer use the following process

Cold
Warm
Hot positive
Hot flash

In hot positive case, the MAX pressure in KG/SQCM is

400
More
Less

Exists one or more degasing period

One
Two
More

Moulding time (IN MINUTES) is

2
5
More

Post curing (or stabization)

The moulded pads are post cured

With diagonal graph

immagine

With steps graph

immagine

With direct graph

immagine

The post cure process has done

In a forced air static oven
In a static air oven

The time/temperature ratio is controlled

Only by the oven temperature display
Other systems

The peak temperature is

Under 180°C
Upper 180°C

Final control after moulding

The good adhesion is verified

This verification has done

Manual
By shear test

With how kind of equipment shear test has done

Manual
Under Norms

The first shear test has done after

Press
Post Cure

The evaluation of % of the residual material on the support after shear test has done

What is the minimum quantity (%) of residual material requested

100
90
Less